2015
January
Milestone 1
POC with PETRONAS for - Early Identification of Potential Down-Hole Problems while Drilling. - Automated Drilling Reporting of Drilling Operations.
2016
January
Milestone 2
Provision for:
• Plant Information (PI) System and Associated Computing Hardware to Tanjung Bin Power Plant.
• LedaFlow Software (Flow Assurance Solution) & Services Supply to Petrofac.
• Software Tools for Development of E&P Applications to PETRONAS Research.
• Bow-Tie HSE Software to JX Nippon.
• Software for Drilling Problems Prediction while Drilling to PETRONAS Carigali.
• Drilling Rigs Performance Benchmarking Solutions to PETRONAS Carigali .

2017
January
Milestone 3
Provision of
• IDS DataNet2™ Online Reporting Services to Repsol.
• Provision of Automated Daily Drilling Reporting for Vestigo, Ophir and Petrofac.

2018
January
Milestone 4
Provision of
• Automated Daily Drilling Reporting for EnQuest.
• Geographical Information System (GIS) Platform to Syarikat Air Kedah.

2019
January
Milestone 5
Provision
• Wells Real Time Center Services for Real Time Operations (RTO), Simulation and Dynamic Monitoring and Technical Limit Drilling Benchmarking to PETRONAS Carigali.
• Wells Intervention Data Clean Up Initiative & Wells Augmented Stuck Pipe (WASP) Indicator for PETRONAS Carigali.

2020
January
Milestone 6
Provision of:
• JV Auto Loader for PETRONAS Carigali.
• Seismic Data Management Core (including Petrel Connector) for Mubadala Petroleum.
• Digital Standing Instruction for Driller (DSID) for PETRONAS Carigali
• Blueback Rocks Velocity Plug-in, Toolboxes plug-in (Geology & Geophysics) for JX Nippon.
• Additional Features in Real Time Visualization Tool based on Subsurface Requirement for Petronas Carigali.
• Seismic Data Management License and Maintenance Services for Mubadala Petroleum

2021
January
Milestone 7
Provision of:
• Blowout and Kill Software for PETRONAS Carigali.
• Digital Rig Acceptance Workflow (DRAW) Solution for PETRONAS Carigali
• Blueback - Petrel Plug-in to JX Nippon.
• Technical Limit Drilling Benchmarking Solution for Repsol.
• ROP Optimisation (ROMA) Solution to PETRONAS Carigali.

2022
January
Milestone 8
Provision of:
• Provision of Rig Mechanised Unit (RMA) for PETRONAS Carigali.
• Wells Real Time Center Services for Real Time Operations (RTO), Simulation and Dynamic Monitoring and Technical Limit Drilling Benchmarking to PETRONAS Brazil & Suriname
• Drill Well on Simulator (DWOS) for PETRONAS Digital.
• Lesson Learned Database (LLDB) and Wells Technologue Catalogue (WTC) for PETRONAS Carigali.